The B3 Guidelines can be applied to the design of new buildings or renovations to meet sustainability goals for site, water, energy, indoor environment, materials and waste. The B3 Guidelines are required on all projects that receive general obligation bond funding from the State of Minnesota. The guidelines can also be used on a voluntary basis on any project. By using the B3 Guidelines, projects will automatically be applying the SB 2030 Energy Standard. After design, during the building occupancy period, the building will also use the B3 Benchmarking tool to track and compare actual energy use and the B3 Post Occupancy Evaluation (POE) to survey occupants on the indoor environmental quality of the building.

B3 Version 3.0 is applicable for projects beginning schematic design or enrolled in the B3 Guidelines Tracking Tool on or after July 1, 2017 and before January 1, 2019.

B3 Version 3.1 is applicable for projects beginning predesign or enrolled in the B3 Guidelines Tracking Tool on or after January 1, 2019 and before January 1, 2020.

B3 Version 3.2r01 has been released and is applicable for projects beginning predesign or enrolled in the B3 Guidelines Tracking Tool on or after January 1, 2020 and prior to the release of subsequent versions.

This update to Version 3.2 includes the B3 Small Buildings Method to better accomodate smaller projects; a summary of the revisions is here: Revisions Summary. Please contact B3 Guidelines Administrators for further detail on how to apply these updates.

Note that the B3 Guidelines now uses the predesign start date to determine which version to use, while the SB 2030 program uses the Schematic Design start date to determine which energy and carbon performance standard applies.

As of January 2023, a fee for non-State funded projects using SB 2030 and the B3 Guidelines is now required in order to cover the cost of project support and review.

This fee applies generally to projects which are not funded through General Obligation Bond fund and which are not associated with a project file in the B3 Guidelines Tracking Tool as of September 16th, 2022 and applies to those projects in the system at that date but which did not submit for Final Design SB 2030 Review with complete project documentation before January 1, 2023. State Agency and Public Higher Education projects are currently exempt from this fee. The fee table and description of services included in the fee can be found below.

SB 2030 and B3 Guidelines Fee Table and Memo